Isabel
Technical Details:
Builder: W.G.
Bagnall, Stafford
Cylinders: 7 inch x 12
inch
No.: 1491
Weight: 7 tons
Year: 1897
Livery: Medium
green, lined red/black/yellow
Wheel
diameter: 1 foot 9
1/2 inches
Wheel base: 3 foot 6
inches
Tank
capacity: 150 gallons
Bunker
capacity: 7 cubic
feet
Boiler
pressure: 140 lbs per
square inch
Tractive
effort at 85% B.P.: 3256 lbs
Length over
buffer beams: 11 feet 7
1/4 inches
Width: 5 feet 6
inches
Height to
chimney: 7 feet 6
3/4 inches
Isabel was one of the earliest locomotives to be built to the design of E.E. Baguley, and one of hundreds of this type built between the 1890s and the 1950s. However, Isabel has Baguley Patent Valve Gear, and she is probably the last working example in the world with this valve gear. She was delivered new on 9th February 1897 to the Cliffe Hill Granite Company of Markfield, Leicestershire, and was named after one of the quarry owner's daughters. She had a fairly uneventful life, initially hauling granite on their mainline, and latterly being used as a shunting engine. Eventually she ceased work around 1946 and was laid up with all the other locomotives at the quarry awaiting the fate of the scrapman's torch.
However, Isabel was lucky. W.G. Bagnall, who were very much still in business in Stafford at that time, were looking for a suitable display locomotive, and in March 1953 Isabel was brought back to be restored by the apprentices, and finally she was put on display on a plinth at Castletown later that year.
She remained on display at the Castle
Works until English Electric took over Bagnalls' in 1961, and
locomotive construction ceased in Stafford. Through the interest of the Stafford Railway Circle (formed 1959)
Isabel was moved to a site in Victoria Park opposite the new (fourth) Railway Station in
Stafford, where she was mounted on a plinth.

Isabel being moved from the former Bagnalls' works (now English Electric Castle Works) in 1963

The Deputy Mayor of Stafford, Councillor Rees L. Tyler, a railway signalman, unveiling Isabel and her
commemorative plaques on 17 June 1963

Panoramic view of Victoria Park, the War Memorial, and Isabel on her plinth in 1964. Image courtesy of Staffordshire Past Track.

Isabel on her plinth in Victoria Park, with the fourth Stafford Station in the background
Isabel was cosmetically restored at the former Bagnalls' works (now GEC Castle Works) by apprentices in 1977.
The side panels and floors were
replaced (side panels in aluminium), and the whole locomotive was ground to the
bare metal and welded where necessary. Isabel was then hand painted, and unveiled
at the Open Day at GEC Castle Works by the Mayor of Stafford, before being transported back to the
plinth outside Stafford Station.

Isabel at the former Bagnalls' works (now GEC Castle Works) being restored by apprentices in 1977. The apprentice with the hat is Steven Bowman, and our informant Graham Carter is at the back.

Isabel's plates after the restoration.
By the early 1980s Isabel
presented a very sorry sight. Her chimney had collapsed and much of
the plate-work was rotten.

In November 1983 she was removed to be restored in
conjunction with Stafford Borough Council, but this initial scheme was
destined not to be completed. It was around this time that a small
number of local enthusiasts heard of Isabel's predicament and
formed the Stafford Narrow Gauge Railway Society Ltd (SNGRS) to
complete a thorough restoration of the locomotive back into steam.
Thus agreement was reached with Stafford Borough Council in October
1987 and work started in earnest at a Council depot. The resultant
restoration over three years repaired the boiler, fitted a new chimney
and saddle-tank, and all new plate-work; the result was awarded the
1989 Dorothea Award for Conservation and the 1993 British Coal Steam
Heritage Award. More recently, she has been fitted with a steam brake
and a steam-air pump of the Westinghouse type to charge the train
brakes.
Isabel arrived at Amerton on 26th
October 1991 and ran her first revenue earning trains in July 1992.

In service she has proved very capable and free steaming, although it
takes about 3 1/2 hours to raise steam due to the design of the
firebox, another Baguley feature. In 1998 three Society members
investigated the mysteries of the Baguley Patent Valve Gear, the
result of which produced modifications that have made a huge
improvement to Isabel's performance.
She has made two working visits to other
NG lines, including the South Tynedale Railway in 1996, and more
recently the Leighton Buzzard Railway, where she was able to haul
lengthy passenger trains in very unfamiliar surroundings!
Isabel was withdrawn from service in October 2007, and her boiler was removed for rebuilding, see below. She was replaced by Emmet for all steam services.

Isabel returned to service in December 2009 after her two year overhaul. This included major repairs to the boiler, rebore of the cylinders with new pistons and rings and new slippers fitted to the crossheads. She was also repainted and relined. However, after the first steaming some rivets in the boiler unfortunately started to leak slightly. The boiler cladding was removed for evaluation and the advice from our boilermaker and boiler inspector was that there was nothing seriously wrong, but the recommendation was that the cladding should be left off for a large proportion of the 2010 season as long as there were leaks.


Videos of Isabel with the Santa Specials in December 2009. To see these you will need a suitable Media Player:
Isabel arriving at Amerton Station with a Santa Special
Isabel departing from Amerton Station with a Santa Special
Isabel is owned by Stafford Borough Council.
Send all comments, updates and queries for The Amerton Railway Locomotive Isabel Page to John Wilcock
Version: 14 04 March 2010 updated by John Wilcock